Topside Engineering & Construction

From concept to
commissioning.

Full EPCI of production facilities, FPSO topside integration, and the turnkey project management and consulting that eliminates interface risk.

Topside Capabilities

Engineered above, integrated throughout.

Full-cycle topside engineering, construction, and project management from concept design through offshore commissioning and start-up.

Structural & Civil Engineering

Structural design, analysis, and engineering for offshore platforms, modules, jackets, and topside facilities to international codes and standards.

PlatformsModulesJackets

FPSO Integration

Topside module integration, turret systems, and production facility engineering for floating production, storage, and offloading vessels.

TopsidesTurretIntegration

Platform Modifications

Brownfield engineering and execution of platform modifications, life extensions, and capacity upgrades on live producing assets under SIMOPS.

BrownfieldLife ExtensionSIMOPS
Live Operations

Process Engineering

Process design, simulation, and optimisation for production facilities including separation, compression, and treatment systems.

SeparationCompressionTreatment

Electrical & Instrumentation

E&I design, procurement, and installation for power distribution, control systems, and safety instrumented systems.

Power Dist.Control SystemsSIS

Offshore Hook-up

Mechanical completion, hook-up, and pre-commissioning of offshore topsides including tie-ins, testing, and system handover.

Mech. CompletionHook-upPre-comm

Procurement & Supply Chain

Global sourcing and supply chain management with rigorous quality control for long-lead items, bulk materials, and specialist equipment.

SourcingVendor MgmtQC

Commissioning & Start-up

Systematic commissioning, performance testing, and safe start-up to first production with complete handover documentation.

TestingStart-upHandover

Execution Model

The EPCIC lifecycle.

VURIN manages every phase of topside delivery through a single, integrated execution framework. Each gate is governed by documented deliverables, quality holds, and interface verification before progression.

Phase 01

Front-End Engineering

Concept selection, FEED development, and basis of design documentation that define scope, cost envelope, and technical risk profile before commitment to detailed engineering.

FEED Concept Selection Basis of Design
01

Phase 02

Detailed Engineering

Multi-discipline detailed design across process, structural, piping, electrical, and instrumentation. All engineering deliverables are produced to international codes with 3D model integration for clash-free execution.

Process Structural Piping E&I
02

Phase 03

Procurement

Strategic sourcing of long-lead equipment, bulk materials, and specialist vendors. VURIN's procurement framework includes vendor qualification, expediting, and logistics coordination to protect the critical path.

Strategic Sourcing Long-Lead Items Vendor Management
03

Phase 04

Fabrication and Assembly

Yard execution of structural steel, piping spools, and module assembly with dimensional control, NDE, and full material traceability. Multi-discipline integration is managed through coordinated work-pack sequencing.

Module Assembly QA/QC NDE
04

Phase 05

Offshore Installation and Hook-up

Heavy-lift operations, module setting, mechanical completion, and hook-up of all process, electrical, and instrumentation systems. Crane studies, rigging analysis, and seafastening design are executed in-house.

Heavy Lift Mechanical Completion Hook-up
05

Phase 06

Commissioning and Start-up

Systematic pre-commissioning, commissioning, and performance testing through to first oil. VURIN manages completion databases, punch-list resolution, and handover documentation to ensure operational readiness.

Pre-Commissioning Performance Testing First Oil
06
Proven Execution

Delivering where it matters most.

View All Case Studies
Topside Installation

FPSO Crane Installations & Overhauls, Multiple Units, Offshore Nigeria

Managed installation and overhauls of several topside pedestal cranes across multiple FPSOs, including heavy lift planning, marine spread coordination, structural interface management, and commissioning support.

EPCIFull Scope
FPSOSpecialists
HLOHeavy Lift Ops
Project Management Flagship

VLCC-to-FPSO Conversion, Cadiz, Spain

Project management of a Very Large Crude Carrier conversion into the FPSO Independence at a Cadiz shipyard, deployed to Nigerian offshore operations. Managed complex multi-discipline deliverables across engineering, fabrication, and outfitting scopes.

EPCIFull Scope
FPSOSpecialists
HLOHeavy Lift Ops

Track Record

Proven execution record.

0
Topside Modules
Delivered
0
Fabrication
Man-hours
0
FPSO
Campaigns
0
Schedule
Adherence

West Africa

FPSO Topside Integration

Full EPCIC delivery of topside process and utility modules for a deepwater FPSO. Scope included detailed engineering, fabrication, offshore installation, hook-up, and commissioning through to first oil.

EPCIC FPSO Deepwater Commissioning
Delivered ahead of schedule with zero LTI

Gulf of Guinea

Production Facility Upgrade

Brownfield modification and capacity upgrade of an existing production facility. Engineering, procurement, and offshore construction management for new separation and compression modules.

Brownfield Modifications Compression Separation
Production capacity increased by 35%

West Africa

Process Module Fabrication and Offshore Installation

Fabrication of process, power generation, and utility modules at a certified yard, followed by heavy-lift offshore installation and mechanical completion on a fixed platform.

Fabrication Heavy Lift Fixed Platform MC
500,000+ man-hours with 99.4% schedule adherence

Fabrication and Integration

Fabrication and integration capability.

VURIN manages fabrication and integration campaigns from material receipt through load-out, with certified yard execution, full traceability, and integrated quality assurance at every stage.

Structural Steel Fabrication

Primary and secondary steel fabrication in certified yards with full material traceability, NDE programmes, and dimensional control to international tolerances.

Certified Yards Full Traceability NDE Dimensional Control

Process Equipment Integration

Installation and alignment of pressure vessels, heat exchangers, rotating equipment, and packaged units with manufacturer-specified procedures and vendor witness testing.

Pressure Vessels Heat Exchangers Rotating Equipment

Module Assembly

Multi-discipline module integration coordinating structural, mechanical, piping, electrical, and instrumentation work packs with 3D-verified dimensional control and weight management.

Multi-Discipline Dimensional Control Weight Management

Offshore Heavy Lift

Heavy-lift engineering including crane studies, rigging analysis, seafastening design, and load-out procedures. VURIN coordinates vessel selection and marine operations for safe module placement.

Crane Studies Rigging Plans Seafastening Load-out
Project Management & Consulting

Navigating complex interfaces and turnkey delivery.

Our project management capability is not a wrapper around subcontracted trades. It is the core discipline that integrates engineering, procurement, construction, and commissioning into a single accountable delivery chain. We provide strategic consulting for complex brownfield and greenfield programmes where interface management is the critical path.

Integrated Programme Management

Multi-discipline coordination from concept selection through to handover and close-out

Interface Management

Systematic identification, tracking, and resolution of cross-discipline interfaces

Risk & Compliance Advisory

Regulatory navigation, stakeholder management, and risk-based decision support across jurisdictions

Schedule & Cost Control

Earned value management, critical path analysis, and change management for complex programmes

Quality and Compliance

Quality, safety, and compliance.

VURIN's integrated management system governs quality assurance, occupational health and safety, and regulatory compliance across every jurisdiction in which we operate. All topside projects are executed under a unified QMS that meets ISO 9001, ISO 45001, and applicable API and ASME codes, with third-party inspection at every critical hold point.

Our HSE record reflects a culture of zero-tolerance for compromise. Every campaign is executed with full permit-to-work systems, job safety analyses, and real-time incident reporting. Compliance is not a department; it is embedded in engineering procedures, fabrication ITPs, and offshore work packs.

ISO 9001 Quality Management System

Certified QMS governing all engineering, procurement, and construction activities.

ISO 45001 Occupational Health and Safety

Systematic hazard identification, risk assessment, and control across all project sites.

API and ASME Code Compliance

Engineering and fabrication to API 6A, API 17D, ASME B31.3, ASME VIII, and project-specific codes.

Third-Party Inspection Protocols

Independent verification at all critical hold points, including NDE, hydrostatic testing, and FAT.

Performance at a Glance

Zero
LTI Target
Every Campaign
ISO 9001
Quality
Management
API/ASME
Code
Compliance
100%
Third-Party
Verified
ISO 9001
ISO 45001
API Certified

Topside Engineering & Construction

Let's build your next facility.

One accountable team from first drawing to first oil. EPCIC, project management, and commissioning with full interface control.